Let you know more our case
Let you know more about our case  
Share:

Berlin Hydrogen Station

Date: 2005-04-11
Views: 95

1.Hamburg Hydrogen Station

In 2003,PERIC provided electrolyzer respectively for hydrogen station which locates in Hamburg, Germany. It is the second time for PERICs products to be applied in hydrogen station. All the technical parameters and specifications meet the requirements of stations perfectly.


The technical parameters of hydrogen generation system of Hamburg station are as follows:

Item

Parameters

H2  Output(Nm3/h)

60

Power(kW, AC)

400

DC Power Consumption (kWh/Nm3)

≤4.8

Lye (% KOH)

30

Pressure of H2 Outlet(bar)

12

Dimension of Container(L×W×H, m)

7.7×2.5×4.3

 

为德国汉堡和柏林加氢站分别提供电解水制氢设备

 

为德国汉堡和柏林加氢站分别提供电解水制氢设备

2. Berlin Hydrogen Station

In 2004,PERIC provided electrolyzer for hydrogen station which locates in Berlin, Germany. All the technical parameters and specifications meet the requirements of stations perfectly.


为德国汉堡和柏林加氢站分别提供电解水制氢设备

 


News / Related news More
2022 - 03 - 10
Beijing Wanquan Hydrogen Refueling Station is designed and constructed by Beijing Peric Hydrogen Company in January of 2022.
2021 - 03 - 09
Wuhan Tielong Hydrogen Refueling Station is designed and constructed by Beijing Peric Hydrogen Company in January of 2021.
Contact us
ZIP:100192
TEL:010-85859600
ADD:Unit C, Block 7#, Dongsheng International Science Park,
Yongtaizhuang North Road, Haidian District, Beijing
Copyright ©2018 - 2021 Beijing Pai Ruihua Hydrogen Enterprise Cloud Website